SELF-STORAGE

Explore: Real Projects, Real Solutions.

Dive into our Construction Case Studies page to explore firsthand accounts of real projects, showcasing our solutions and valuable insights for a comprehensive understanding of successful construction endeavors.

NEED ADVICE?

Submit Your Construction Worry & We'll Engineer You

A Solution

Everything you need to turn your project into reality.

 

Submit An Inquiry
Life-Storage1-1-1
life storage

Life Storage

Challenge – This ground-up three-story climate controlled self-storage facility commenced in late fall and was constructed during the winter months on a closed site that sat 80-feet up an embankment from the adjoining roadways. A new prototype building that incorporated conventional exterior finishes onto a pre-engineered building, design considerations evolved throughout the construction.

Solution – Fiorilli coordinated a site logistics plan to account for special material delivery and rigging challenges inherent with the projects site limitations and work closely with the owner to minimize winter conditions costs and confirm all new prototype design details.

Results – The project was delivered on time in spring of the following year and met all prototype criteria. Limited winter escalation costs allowed the owner to achieve their overall project budget.

“On my second consecutive project with Mike Smith serving as the project Superintendent, I was confident in his attention to the many design considerations and knew he would look out for our best interests.” – Dan Schwantz, Project Director – Life Storage (formerly Uncle Bob’s Self Storage)

Life-Storage1-1-1

Life Storage

Challenge – This ground-up three-story climate controlled self-storage facility commenced in late fall and was constructed during the winter months on a closed site that sat 80-feet up an embankment from the adjoining roadways. A new prototype building that incorporated conventional exterior finishes onto a pre-engineered building, design considerations evolved throughout the construction.

Solution – Fiorilli coordinated a site logistics plan to account for special material delivery and rigging challenges inherent with the projects site limitations and work closely with the owner to minimize winter conditions costs and confirm all new prototype design details.

Results – The project was delivered on time in spring of the following year and met all prototype criteria. Limited winter escalation costs allowed the owner to achieve their overall project budget.

“On my second consecutive project with Mike Smith serving as the project Superintendent, I was confident in his attention to the many design considerations and knew he would look out for our best interests.” – Dan Schwantz, Project Director – Life Storage (formerly Uncle Bob’s Self Storage)

Free Download

A Complete Pillar Strategy Guide

Everything you need to start creating your pillar page flows today.

Call to Action